Pomona 60 FWY Construction Lane Closures (Fri- Mon, Aug 09-12, 2013)

Aug 09-12, 2013

Pomona 60 FWY Construction Lane Closures (Fri- Mon, Aug 09-12, 2013)



(Cal Trans District 7 Map and Information. Click on link below:)

http://caltransd7info.blogspot.com/2013/06/summer-slam-on-60.html



VIDEO

http://www.youtube.com/watch?v=cKzhcoqZDNo&list=UU1ZcA6W8sA8psJ8msxI3ODg



Summer Slam on 60 will bring a smoother ride on the Pomona Freeway.



Expect delays and plan your route ahead of time.

Hint hint: http://quickmap.dot.ca.gov/



A series of 55-hour weekend lane closures are scheduled beginning Friday, July 12, 2013 and continuing for three more non-consecutive weekends through August 26, 2013.



Caltrans will close 2-3 freeway lanes between Nogales Street and Fullerton Road. Although NOT a full weekend freeway closure, motorists will experience delays and are strongly advised to use alternate routes.



Closure Information:



Friday, August 9 at 10 p.m. Monday, August 12 at 5 a.m. 3 lanes of eastbound SR-60 to be closed

Friday, August 23 at 10 p.m. Monday, August 26 at 5a.m.2 lanes of eastbound SR-60 to be closed

Full freeway closure will be in effect in direction of weekend closure Saturday 1 a.m. Saturday 5 a.m. and Monday 1 a.m. Monday 5 a.m. for k-rail installation




Caltrans map
Caltrans map










The LASD.org® website has made reasonable efforts to provide an accurate translation. However, no automated or computerized translation is perfect and is not intended to replace human or traditional translation methods. The official text is the English version of LASD.org® website. If any questions arise concerning the accuracy of the information presented by the translated version of the website, please refer to the English edition of the website, which is the official version.
Los Angeles County Seal

© Copyright 2014 .  LASD. All Rights Reserved             LASD Badge and Patch are Registered Trademarks.